Projectdetails
  • Year: 2012
  • Market: Port development
  • Vessel: Happy R-type
  • Cargo: Ship unloader

Discharge ship loader

Discharge of Sandvik ship loader at EMO Terminal - Rotterdam

On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.

The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.

BigLift is proud to contribute to the development of this new quay of the EMO terminal.

Other projects in Port development

CY Interocean I for BigLift from Tianjin to Surabaya

Two 341 mt Terex-Gottwald cranes

RTGs and STC crane for Mombasa

Two shipments of gantry cranes for Sanitation NY

Huisman's newbuilding HLMC

Three ship unloaders

Goliath Gantry Crane

Replacing shiploaders at Carrington terminal - phase 2

Stacker reclaimer and tripper car

BigLift Shipping transports two Siwertell CSU’s

STS container crane to Guadeloupe

Oversized STS cranes to Savannah

Want to know more?
Contact us
Explore our markets
Explore