Discharge ship loader

Discharge of Sandvik ship loader at EMO Terminal - Rotterdam

On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.

The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.

BigLift is proud to contribute to the development of this new quay of the EMO terminal.

Other projects in Port development

Amrun project

Jetty extension of the Tempa Rossa refinery at Taranto by Happy Sky

3 STSC cranes to Honolulu

Five mobile cranes

Oversized STS cranes to Savannah

Biggest shiploader so far

73 M HYBRID BOOM CRANE

Two 341 mt Terex-Gottwald cranes

BigLift Shipping transports two Siwertell CSU’s

CY Interocean I moves 3 STS cranes

Two Coal Ship Unloaders

Stacker reclaimer and tripper car

Want to know more?
Contact us
Explore our markets
Explore