Direct contact

HQ +31(0)20-4488300
Stay connected

Petrochemical, Power, LNG

Installation Loading and Condensate arms

Installation Loading and Condensate arms

40,000 m3 of tanks transported on Happy Delta’s deck

40,000 m3 of tanks transported on Happy Delta’s deck

LARGE COLUMN (110 M - 1,315 MT)

LARGE COLUMN (110 M - 1,315 MT)

Modules for Venezuela

Modules for Venezuela

18 Liquid Propane Gas tanks

18 Liquid Propane Gas tanks

Reactor and Cold separator

Reactor and Cold separator

Six massive coke drums for Chevron

Six massive coke drums for Chevron

Installation loading arms

Installation loading arms

Active Heave Compensation on Happy-D type vessels

Columns and drums

Columns and drums

For Electric Power Plant

Power Plant Generating Sets

Power Plant Generating Sets

to various destinations

Coke Oven modules

Coke Oven modules

Two shipments Coke Oven modules for coal production plant

Refinery modules

Refinery modules

Shipment 59 preassembled refinery modules

Want to know more?
Contact us
Explore our markets
Explore