Direct contact

HQ +31(0)20-4488300
Stay connected
Projectdetails
  • Year: July 2014
  • Market: Petrochemical, Power, LNG

Reactor and Cold separator

In June 2014 mv Tramper has loaded a 360 mt reactor and a 328 mt cold separator in Ortona (Italy) and has discharged the load successfully in Kavkaz (Russia).

Other projects in Petrochemical, Power, LNG

Columns and drums

Installation Loading and Condensate arms

Three mega reactors to the Sriracha refinery

130,000 FRT for Tobolsk 2 Project

Loading arm replacement at Sakhalin

Power Plant Generating Sets

40,000 m3 of tanks transported on Happy Delta’s deck

Six massive coke drums for Chevron

18 Liquid Propane Gas tanks

Coke Oven modules

Modules for Venezuela

Installation loading arms

Want to know more?
Contact us
Explore our markets
Explore