Direct contact

HQ +31(0)20-4488300
Stay connected
Projectdetails
  • Year: 2012
  • Market: Port development
  • Vessel: Happy R-type
  • Cargo: Ship unloader

Discharge ship loader

Discharge of Sandvik ship loader at EMO Terminal - Rotterdam

On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.

The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.

BigLift is proud to contribute to the development of this new quay of the EMO terminal.

Other projects in Port development

Huisman's newbuilding HLMC

530 MT Ship unloader

HTVs BigLift Baffin & CY Interocean I loading in Oita

RTGs and STC crane for Mombasa

73 M HYBRID BOOM CRANE

Replacing shiploaders at Carrington Terminal - phase 1

Discharge ship loader

BTC Crane and Offshore jib crane

Mounting Luffing Harbour Cranes

Five mobile cranes

CSU installed at Haramachi thermal electric power station

5 STS cranes

Want to know more?
Contact us
Explore our markets
Explore