Direct contact

HQ +31(0)20-4488300
Stay connected
Projectdetails
  • Year: May 2017
  • Market: Petrochemical, Power, LNG
  • Vessel: Happy Buccaneer

25,000 cbm petrochemical equipment

BigLift’s ‘Grand Old Lady’ mv Happy Buccaneer is still going strong. On May 11 2017, she discharged about 25,000 cbm petrochemical equipment in Umm Qasr (Iraq) for the Karbala Refinery Project. All equipment was loaded in Korea three weeks earlier.

Despite long lengths up to 70 mtrs and units weights up to 700 metric tons, handling the cargo – consisting of gas bullet tanks, a vacuum column, an atmospheric tower and accompanying equipment – was still ‘a piece of cake’ for the lady with her two 700 tons cranes.

After discharge, Happy Buccaneer returned to China for loading the next full load to the USA Gulf. 

Other projects in Petrochemical, Power, LNG

Loading arm replacement at Sakhalin

Dangote Project

Antarctic research station in need of fuel

Sergipe power plant project

Six massive coke drums for Chevron

Installation Loading and Condensate arms

130,000 FRT for Tobolsk 2 Project

Coke Oven modules

25,000 cbm petrochemical equipment

Sasol project - Jumbo BigLift Projects

40,000 m3 of tanks transported on Happy Delta’s deck

Large UHCU fractionators

Want to know more?
Contact us
Explore our markets
Explore