Projectdetails
  • Year: July 2014
  • Market: Petrochemical, Power, LNG

Reactor and Cold separator

In June 2014 mv Tramper has loaded a 360 mt reactor and a 328 mt cold separator in Ortona (Italy) and has discharged the load successfully in Kavkaz (Russia).