Projectdetails
  • Year: February 2020
  • Market: Petrochemical, Power, LNG
  • Vessel: P-type

Modules for MODEC FPSO

BigLift Shipping has shipped two topside modules for MODEC FPSO Carioca (Project MV-30) from Angra Dos Reis, Brazil, to Dalian, China, operating Spliethoff’s mv Poolgracht.

The FPSO is being built in China and will be delivered with Brazilian built modules, following the successful experience in the latest projects in the country.

These two modules (amongst other modules) will be installed on FPSO Carioca. When finished the FPSO will be transported to Bazil to be taken into service.

The FPSO will be capable of processing 180,000 barrels of crude oil per day, 212 million standard cubic feet of gas per day, 240,000 barrels of water injection per day and has storage capacity of 1,400,000 barrels of crude oil.

 

Other projects in Petrochemical, Power, LNG

Three mega reactors to the Sriracha refinery

25,000 cbm petrochemical equipment

LARGE COLUMN (110 M - 1,315 MT)

Sergipe power plant project

Columns and drums

Large UHCU fractionators

40,000 m3 of tanks transported on Happy Delta’s deck

Installation loading arms

Six massive coke drums for Chevron

Loading arm replacement at Sakhalin

Reactor and Cold separator

Modules for MODEC FPSO

Want to know more?
Contact us
Explore our markets
Explore