Projectdetails
  • Year: 2012
  • Market: Mining
  • Vessel: Happy Buccaneer
  • Cargo: Shuttle truss sections, Transfer stations

Iron ore expansion

project in Port Hedland Australia

For a resources company’s iron ore expansion project at Port Hedland, Happy Buccaneer  used the brand new flyjib to lift and position two shuttle truss sections (each approx. 310 mt) and two transfer stations (each approx. 200 mt).

The addition of the 17 metre long flyjib to one of Happy Buccaneer’s cranes provided the 35 metre outreach and the hook hight of 52 metres required to position the four sections. It took only two days to install the sections installed neatly in their designated positions.

The two days were not consecutive as cyclone Heidi made an unscheduled appearance in the middle of the operation. All ships had to leave the port and Happy Buccaneer had an uncomfortable two days riding out the cyclone off Port Hedland. She then returned to port to complete the discharge of the two shuttle trusses which had remained on board throughout. 

Other projects in Mining

Wharfdecks to Cape Lambert

Iron ore expansion

Constructions for Milne Inlet

Cape Lambert Port B Project

Heaviest continuous ship unloader ever shipped by Happy Star

Iron ore shiploader and tripper car

Two complete shiploaders on the move

Two shiploaders to Sept Iles

Coal shiploader

Want to know more?
Contact us
Explore our markets
Explore