Direct contact

HQ +31(0)20-4488300
Stay connected
Projectdetails
  • Year: 2012
  • Market: Port development
  • Vessel: Happy R-type
  • Cargo: Ship unloader

Discharge ship loader

Discharge of Sandvik ship loader at EMO Terminal - Rotterdam

On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.

The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.

BigLift is proud to contribute to the development of this new quay of the EMO terminal.

Other projects in Port development

Three new Siwertell ship unloaders to Singapore

73 M HYBRID BOOM CRANE

Replacement two GSUs in Kaoshiung

CY Interocean I moves 3 STS cranes

Oversized STS cranes to Savannah

5 STS cranes

The Sino Iron Project

Mounting Luffing Harbour Cranes

STS container crane to Guadeloupe

Two shipments of gantry cranes for Sanitation NY

Two Coal Ship Unloaders

1220 mton shiploader

Want to know more?
Contact us
Explore our markets
Explore