Direct contact

HQ +31(0)20-4488300
Stay connected
Projectdetails
  • Year: July 2019
  • Market: Port development
  • Vessel: MC-class

3 STSC cranes to Honolulu

BigLift Baffin moved three enormous STSC cranes from Oita, Japan to Honolulu, Hawaii for our client MES.

In Oita, the cranes were rolled on board over the side of BigLift Baffin. Each crane weighed 1,431 mt and was 70 metres high. Their footprint was just over 30 metres, which meant that the rear of the cranes reached over the port side of the vessel by more than 32 metres and the loading arm over starboard by 48 metres.

The voyage over the Pacific Ocean took 17 days and the cranes were safely discharged in the port of Honolulu, again by Ro-Ro over the side of BigLift Baffin.

Other projects in Port development

Oversized STS cranes to Savannah

Replacing shiploaders at Carrington terminal - phase 2

CY Interocean I moves 3 STS cranes

Automatic Stacking Cranes Happy Sky

73 M HYBRID BOOM CRANE

Amrun project

Three ship unloaders

Barge loader to Kamsar

3 STSC cranes to Honolulu

1220 mton shiploader

BigLift Shipping transports two Siwertell CSU’s

CY Interocean I for BigLift from Tianjin to Surabaya

Want to know more?
Contact us
Explore our markets
Explore