Projectdetails
  • Year: May 2017
  • Market: Petrochemical, Power, LNG
  • Vessel: Happy Buccaneer

25,000 cbm petrochemical equipment

BigLift’s ‘Grand Old Lady’ mv Happy Buccaneer is still going strong. On May 11 2017, she discharged about 25,000 cbm petrochemical equipment in Umm Qasr (Iraq) for the Karbala Refinery Project. All equipment was loaded in Korea three weeks earlier.

Despite long lengths up to 70 mtrs and units weights up to 700 metric tons, handling the cargo – consisting of gas bullet tanks, a vacuum column, an atmospheric tower and accompanying equipment – was still ‘a piece of cake’ for the lady with her two 700 tons cranes.

After discharge, Happy Buccaneer returned to China for loading the next full load to the USA Gulf. 

Other projects in Petrochemical, Power, LNG

Sasol project - Jumbo BigLift Projects

Modules for Venezuela

Modules for MODEC FPSO

Dangote Project

Installation Loading and Condensate arms

Installation loading arms

Talara project

25,000 cbm petrochemical equipment

LARGE COLUMN (110 M - 1,315 MT)

Columns and drums

Power Plant Generating Sets

Large UHCU fractionators