Direct contact

HQ +31(0)20-4488300
Stay connected
Projectdetails
  • Year: July 2017
  • Market: Petrochemical, Power, LNG
  • Vessel: Happy R-type

130,000 FRT for Tobolsk 2 Project

BigLift's Happy River transported a total volume of 130,000 FRT from Antwerp, Belgium, destined for a remote petrochemical complex located in Tobolsk, Russia, for her client Deugro.

To avoid the congestion at the Port of Sabetta the transshipment operation was conducted in the arctic area of Novy Port. This remote port is located approximately 300 nautical miles south of Sabetta within the Gulf of Ob and does not have any landside infrastructure. All cargo needed to be discharged on anchorage while facing the harsh local weather and hostile environment.

Other projects in Petrochemical, Power, LNG

Modules for Venezuela

Power Plant Generating Sets

Dangote Project

Loading arm replacement at Sakhalin

Reactor and Cold separator

Sergipe power plant project

Columns and drums

Installation loading arms

Sasol project - Jumbo BigLift Projects

Installation Loading and Condensate arms

Six massive coke drums for Chevron

Large UHCU fractionators

Want to know more?
Contact us
Explore our markets
Explore