直接联系人

HQ +31(0)20-4488300
保持联系
Projectdetails
  • Year: 2014
  • Market: Petrochemical, Power, LNG

Reactor and Cold separator

In June 2014 mv Tramper has loaded a 360 mt reactor and a 328 mt cold separator in Ortona (Italy) and has discharged the load successfully in Kavkaz (Russia).

Petrochemical, Power, LNG 中的其他项目

Developments in Nigeria – Dangote Project

Columns and drums

13 SJR chemical tanks

Installation Loading and Condensate arms

Three mega reactors to the Sriracha refinery

Power Plant Generating Sets

130,000 FRT for Tobolsk 2 Project

Modules for Venezuela

Loading arm (re)placement at Sakhalin

Coke Oven modules

Six massive coke drums for Chevron

Reactor and Cold separator