直接联系人

HQ +31(0)20-4488300
保持联系
Projectdetails
  • Year: N 2020
  • Market: Petrochemical, Power, LNG
  • Vessel: P-type

Modules for MODEC FPSO

BigLift Shipping has shipped two topside modules for MODEC FPSO Carioca (Project MV-30) from Angra Dos Reis, Brazil, to Dalian, China, operating Spliethoff’s mv Poolgracht.

The FPSO is being built in China and will be delivered with Brazilian built modules, following the successful experience in the latest projects in the country.

These two modules (amongst other modules) will be installed on FPSO Carioca. When finished the FPSO will be transported to Bazil to be taken into service.

The FPSO will be capable of processing 180,000 barrels of crude oil per day, 212 million standard cubic feet of gas per day, 240,000 barrels of water injection per day and has storage capacity of 1,400,000 barrels of crude oil.

 

Petrochemical, Power, LNG 中的其他项目

Power Plant Generating Sets

Loading arm (re)placement at Sakhalin

18 Liquid Propane Gas tanks

LARGE COLUMN (110 M - 1,315 MT)

Developments in Nigeria – Dangote Project

Habu Mamoet tanks

Talara project

Jumbo BigLift Projects - Sasol project

Large UHCU fractionators

Installation Loading and Condensate arms

130,000 FRT for Tobolsk 2 Project

Four voyages for the Sergipe power plant project