Projectdetails
  • Year: 2012
  • Market: Port development
  • Vessel: Happy R-type
  • Cargo: Ship unloader

Discharge ship loader

Discharge of Sandvik ship loader at EMO Terminal - Rotterdam

On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.

The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.

BigLift is proud to contribute to the development of this new quay of the EMO terminal.

Port development 中的其他项目

BTC Crane and Offshore jib crane

Biggest shiploader so far

BigLift Shipping transports 2 Siwertell CSU’s

530 MT SHIP UNLOADER

Five Kone ARMG cranes

Goliath Gantry Crane

CSU installed at Haramachi thermal electric power station

Jetty extension of the Tempa Rossa refinery at Taranto by Happy Sky

5 STS cranes

BigLift Baffin & CY Interocean I loading in Oita

Two 341 mt Terex-Gottwald cranes

Huisman's newbuilding HLMC