直接联系人

HQ +31(0)20-4488300
保持联系
Projectdetails
  • Year: 2019
  • Market: Port development
  • Vessel: MC-class

3 STSC cranes to Honolulu

BigLift Baffin moved three enormous STSC cranes from Oita, Japan to Honolulu, Hawaii for our client MES.

In Oita, the cranes were rolled on board over the side of BigLift Baffin. Each crane weighed 1,431 mt and was 70 metres high. Their footprint was just over 30 metres, which meant that the rear of the cranes reached over the port side of the vessel by more than 32 metres and the loading arm over starboard by 48 metres.

The voyage over the Pacific Ocean took 17 days and the cranes were safely discharged in the port of Honolulu, again by Ro-Ro over the side of BigLift Baffin.

Port development 中的其他项目

Four 320 mt gantry cranes

CY Interocean I moves 3 STS cranes

Replacing shiploaders at Carrington terminal - phase 2

Five Kone ARMG cranes

5 STS cranes

530 MT SHIP UNLOADER

CY Interocean I for BigLift from Tianjin to Surabaya

BigLift Baffin & CY Interocean I loading in Oita

BigLift Shipping transports 2 Siwertell CSU’s

RMGs and RTGs for Global Container Terminals New York LP

Stacker reclaimer and tripper car

BigLift Baffin 3 STC Honolulu