Projectdetails
  • Year: 2012
  • Market: Port development
  • Vessel: Happy R-type
  • Cargo: Ship unloader

Discharge ship loader

Discharge of Sandvik ship loader at EMO Terminal - Rotterdam

On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.

The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.

BigLift is proud to contribute to the development of this new quay of the EMO terminal.

Другие проекты в Port development

The Sino Iron Project

Replacing shiploaders at Carrington Terminal

BigLift’s Happy Sky transports two oversized STS container cranes

BTC Crane and Offshore jib crane

Happy Star STS container crane-final

Goliath Gantry Crane

Four 320 mt gantry cranes

CSU installed at Haramachi thermal electric power station

Two ship unloaders

Jetty extension of the Tempa Rossa refinery at Taranto by Happy Sky

1220 mton shiploader

73 M HYBRID BOOM CRANE