Прямой контакт

HQ +31(0)20-4488300
Оставайтесь на связи
Projectdetails
  • Year: 2012
  • Market: Port development
  • Vessel: Happy R-type
  • Cargo: Ship unloader

Discharge ship loader

Discharge of Sandvik ship loader at EMO Terminal - Rotterdam

On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.

The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.

BigLift is proud to contribute to the development of this new quay of the EMO terminal.

Другие проекты в Port development

RMGs and RTGs for Global Container Terminals New York LP

Replacing shiploaders at Carrington Terminal

Five mobile cranes

1220 mton shiploader

Replacing shiploaders at Carrington terminal - phase 2

Happy Sky voy 1901 Kamsar Final

Three ship unloaders

Amrun project

Happy Star STS container crane-final

The Sino Iron Project

CY Interocean I moves 3 STS cranes