Projectdetails
  • Year: 2012
  • Market: Port development
  • Vessel: Happy R-type
  • Cargo: Ship unloader

Discharge ship loader

Discharge of Sandvik ship loader at EMO Terminal - Rotterdam

On March 22nd early morning Biglifts’ Mv Happy River arrived safely at the EMO Terminal in Rotterdam with a new Sandvik ship loader. The rest of the day and the next day were used to successfully discharge the partly dismantled loader at the new quay by means of Happy River powerful heavy lift cranes.

The heaviest lift in this operation was 485 metric tons. This operation has been carefully planned and engineered in close cooperation with Sandvik and with the EMO.

BigLift is proud to contribute to the development of this new quay of the EMO terminal.

Другие проекты в Port development

Biggest shiploader so far

Mounting Luffing Harbour Cranes

Five mobile cranes

Happy Star STS container crane-final

Replacing shiploaders at Carrington Terminal

Automatic Stacking Cranes Happy Sky

CY Interocean I for BigLift from Tianjin to Surabaya

BTC Crane and Offshore jib crane

BigLift Baffin 3 STC Honolulu

BigLift’s Happy Sky transports two oversized STS container cranes

Two ship unloaders

Three ship unloaders