Projectdetails
  • Year: 2014
  • Market: Port development
  • Vessel: Other

5 STS cranes

BigLift Shipping was awarded the transportation of 5 STS (ship-to-shore) cranes from Hailong, China to Surabaya, Indonesia for the Teluk Lamong container terminal. For this transportation BigLift chartered deck carrier Korea Express, and moved the cranes to Surabaya in two voyages.

In the port of Hailong, the vessel’s deck was fitted with rails and winches, so that the 820 mt cranes could be pulled onto the flat deck. The full loading operation for the first voyage, including laying out the deck fittings and seafastening, was completed in only 6 days.

The vessel arrived in Surabaya after 12 days of sailing. There the cranes were rolled onto the quay with the winches and landed in their quay-side rails with the use of hydraulic cylinders.

Другие проекты в Port development

Replacing shiploaders at Carrington terminal - phase 2

Five mobile cranes

Two 341 mt Terex-Gottwald cranes

CSU installed at Haramachi thermal electric power station

Two Coal Ship Unloaders

Stacker reclaimer and tripper car

RMGs and RTGs for Global Container Terminals New York LP

Replacement two GSUs in Kaoshiung

1220 mton shiploader

Four 320 mt gantry cranes

The Sino Iron Project